We completed this job in Needham over the past few weeks! There was very tight access and we had to back in from the main road every load, but we got it done without a sweat!
-270 sqft concrete patio removed
-Downspout drain to drywell w/ pop up drain
-Prep 800 sqft area for paver patio
Prep 300 sqft pad for a raised deck